External façade primarily finished in Portuguese limestone cladding with granite band at plinth
Strip glazing utilising continuous silicon jointed frameless curtain walling combining glass and opacified glass panels which provide a continuous glazed appearance to the top floor façade, entrance and north east facing corner of the building
Strip windows set back from the stone façade are framed by coloured powder coated aluminium reveals which define the new glazing proportion and rhythm along the building elevations
M&E designed to accommodate occupation capacity of 1 per 8 SQ M
Building Energy Management System (BEMS)
Floor by floor metering
Water efficient automated appliances
High quality natural stone finishes throughout the common areas
Three energy efficient 13-person passenger lifts
4 male and 4 female and 1 unisex wheel chair accessible shower facility
Male and female locker/changing/drying room facilities
Dedicated set down area
16 basement level car parking spaces
94 secure bicycle spaces
Basement communications room for telecoms providers
CCTV system incl fire alarm and LED emergency lighting
The Offices
Suspended metal ceilings
Low energy four pipe fan coil system with fresh air handling throughout
Energy efficient LED lighting system
Plastered walls with selected superior matt painted finish
High quality thermal performance double glazed windows
Raised access metal floor with underfloor power track capacity 1 person per 8 SQ M
Quality carpet tile finish
The Reception
High quality bespoke reception desk of natural stone with laminate timber back and floating effect created by lighting at plinth level
Feature wall comprising selected finsa, Roble Gris vintage and Eucalipto Gris veneered board with back painted glass sections
Back painted glass to cover riser doors, frame and surrounds
Acoustic ceiling to double height space
High quality reception furniture
Natural Stone Flooring
Lift Lobby
Proprietary gypsum MF plasterboard ceilings with feature strip lighting
Polished plaster wall finish with recessed stone skirting
Feature wall comprising selected finsa, Roble Gris Vintage and Eucalipto gris veneered board and back painted glass
Selected natural stone tiling with frameless flush integrated strip lighting
Stainless steel lift panel surrounds
Aluminium framed glazed double doors and fixed side glazing to office space
Natural stone floor tiling with honed finish
WC AND CHANGING ROOM FACILITIES
Plasterboard ceilings with feature down lighting
Selected ceramic wall tiles incorporating mosaic to feature wall
Back painted glass on both sides of trough and back panel
Proprietary IPS panel system to match cubicles with selected high quality Formica laminate finish
Hardwood veneer door leaf with solid hardwood frames and architraves
Linear wash hand basin system with Corian finish with over sink mirror
Feature back painted glass surround to vanity units
High quality ceramic sanitary ware and fittings
Full height toilet cubicle system with high quality Formica laminate finish
Drying/locker room and 9 individual enclosed showers in the basement core area